Title: Applying simheuristics to minimize overall costs of an MRP planned production system
Author: Castaneda, Juliana  
Panadero Martínez, Javier
Seiringer, Wolfgang
Altendorfer, Klaus
Juan, Angel A.  
Others: University of Applied Sciences Upper Austria
Universitat Politècnica de València
Universitat Oberta de Catalunya
Citation: Seiringer, W., Castañeda, J., Atendorfer, K., Panadero, J. & Juan Perez, A.A. (2022). Applying Simheuristics to Minimize Overall Costs of an MRP Planned Production System. Algorithms, 15(2), 1-18. doi: 10.3390/a15020040
Abstract: Looking at current enterprise resource planning systems shows that material requirements planning (MRP) is one of the main production planning approaches implemented there. The MRP planning parameters lot size, safety stock, and planned lead time, have to be identified for each MRP planned material. With increasing production system complexity, more planning parameters have to be defined. Simulation-based optimization is known as a valuable tool for optimizing these MRP planning parameters for the underlying production system. In this article, a fast and easy-to-apply simheuristic was developed with the objective to minimize overall costs. The simheuristic sets the planning parameters lot size, safety stock, and planned lead time for the simulated stochastic production systems. The developed simheuristic applies aspects of simulation annealing (SA) for an efficient metaheuristic-based solution parameter sampling. Additionally, an intelligent simulation budget management (SBM) concept is introduced, which skips replications of not promising iterations. A comprehensive simulation study for a multi-item and multi-staged production system structure is conducted to evaluate its performance. Different simheuristic combinations and parameters are tested, with the result that the combination of SA and SBM led to the lowest overall costs. The contributions of this article are an easy implementable simheuristic for MRP parameter optimization and a promising concept to intelligently manage simulation budget.
Keywords: MRP
planning parameter
optimization
simulation budget
heuristics
DOI: https://doi.org/10.3390/a15020040
Document type: info:eu-repo/semantics/article
Version: info:eu-repo/semantics/publishedVersion
Issue Date: 27-Jan-2022
Publication license: info:eu-repo/semantics/openAccess
http://creativecommons.org/licenses/by/4.0  
Appears in Collections:Articles cientÍfics
Articles

Files in This Item:
File Description SizeFormat 
algorithms-15-00040.pdf367,17 kBAdobe PDFThumbnail
View/Open